The Challenge
To install a canvas array on drywall, composed of (10) digital displays with the power and media player installed above the ceiling.
Our Solution
Utilization of micro adjustment screws were crucial to ensure that the digital displays were level and equally spaced. Our technicians ensured that all debris was disposed of properly and required deliverables were provided to our client.